The Local State

How we know

Documents behind the public answers.

Open the laws, directories, maps, reports and official pages used on the site. Each public answer links back to the exact record checked.

311 sources checked

Act6
  • The Cantonments Act, 1924

    Sections 19A and 19B distinguish the cantonment local area from its electoral wards and require ward boundaries to stay within cantonment limits. Lahore's current boundary geometry needs a separate instrument. The earlier ML&C file returned HTTP 403. The archived replacement comes from the Ministry of Law and Justice Pakistan Code.

    Government of Pakistan · 2026-08-02

  • Oil and Gas Regulatory Authority Ordinance 2002, consolidated through 3 August 2022

    Primary law. It establishes OGRA and its powers. It is not SNGPL licence NG-002/2003 and does not prove that licence's schedules, territory or conditions.

    Ministry of Law and Justice, Government of Pakistan · 2026-08-03

  • Punjab Civil Administration Act 2017

    The official Lahore legal-framework page identifies Act III of 2017 and links the Punjab Code. Section 3 establishes a Commissioner for each division, a Deputy Commissioner for each district and an Assistant Commissioner for each tehsil.

    Government of Punjab · 2026-08-02

  • Punjab Emergency Service Act 2006

    The checked consolidated copy is preserved in the LSRW research archive. Sections 5 to 7 establish the Service, the Punjab Emergency Council and the Council's station-number function.

    Provincial Assembly of the Punjab · 2026-08-03

  • Punjab Primary and Secondary Healthcare Services Act 2025

    The reviewed text is used for the statutory clinic, catchment and referral design. It does not prove that the required determinations or referral procedures have been published or implemented.

    Provincial Assembly of the Punjab · 2026-08-03

  • Punjab Water and Sanitation Authority Act 2025

    The public PWASA page links to a local development hostname. The archived official file was retrieved from the same path on the public pwasa.gop.pk host.

    Provincial Assembly of the Punjab · 2026-08-02

Budget8
Correspondence1
Court decision1
Dataset29
  • Lahore National Assembly constituency geography reconstruction

    Fourteen CC0 constituency vectors were transformed as one set to the reviewed Lahore district reference extent. Seat identities were checked against the ECP 2023 delimitation. The result is a working locator, not an ECP legal map.

    The Local State · 2026-08-06

  • Lahore Police Officer Directory 2025

    The eight-page directory is dated separately by Lahore Police division between 25 August and 1 September 2025. Its rows use police ranks, service numbers and official mobile-number patterns. The mirror is not an official Punjab Police host, so every assignment from it remains a dated reconstructed observation. Personal and official mobile numbers are deliberately not copied into the project.

    Unknown document author; mirror uploaded to Scribd by Baku Vlogs · 2026-08-05

  • Lahore Police SHO directory, 1-2 January 2026

    The eight-page directory contains dated divisional rosters for all 84 canonical Lahore police stations. City, Civil Lines, Cantt and Saddar are dated 1 January 2026. Model Town and Iqbal Town are dated 2 January 2026. The mirror is not an official Punjab Police host, so every assignment remains a dated reconstructed observation. Personal and official phone numbers are deliberately not copied into the project.

    Unknown document author; mirror uploaded to Scribd by mnjmlgmlcmmian · 2026-08-06

  • Lahore Police SHO directory, 29 November 2020

    The mirror title supplied by Scribd is inaccurate. The document body is headed LIST OF SHO 29.11.2020 and every page is dated 29 November 2020. Its three pages cover all six Lahore police divisions and 84 station rows. Additional-charge labels are preserved. The mirror is not an official Punjab Police host, so every assignment remains a dated reconstructed observation. Phone numbers are deliberately not copied.

    Unknown document author; mirror uploaded to Scribd by Viliand Sarac · 2026-08-06

  • Lahore Punjab Assembly constituency geography reconstruction

    Thirty Lahore constituency paths were extracted and transformed as one set to the reviewed Lahore district reference extent. Seat identities were checked against the ECP 2023 delimitation. The result is a working locator, not an ECP legal map.

    The Local State · 2026-08-06

  • LDA approved schemes register

    The archived Inertia payload contains 398 public approved-scheme records. Administrative portal settings were excluded from the public derivative. A register entry does not supply a legal boundary or road-maintenance assignment.

    Lahore Development Authority · 2026-08-05

  • LDA illegal schemes register

    The archived Inertia payload contains 383 public illegal-scheme records. Directorate and zone values are preserved as published. Their office semantics have not been inferred.

    Lahore Development Authority · 2026-08-05

  • LDA regular schemes register

    The archived Inertia payload contains 19 regular-scheme records and their published map links. A published map centre is a navigation point, not a legal scheme boundary. The public response's embedded browser map key was redacted from the local archive.

    Lahore Development Authority · 2026-08-05

  • Lahore open-map place index from the 2026-08-01 Protomaps snapshot

    The index preserves named open-map features and point coordinates from the 2026-08-01 Protomaps snapshot. The build script is scripts/build-lahore-place-index.mjs. These points provide map context. They do not establish official school locations, public ownership, admissions, catchments, present operation or responsible officers.

    OpenStreetMap contributors · 2026-08-01

  • OpenStreetMap Lahore waterway lines

    The pinned Pakistan shapefile was filtered to 256 mapped canal, drain, ditch and stream line features touching the official PULSE Lahore district polygon. It supplies map context only. It does not establish ownership, maintenance duty, catchment, capacity, condition or current desilting.

    OpenStreetMap contributors via Geofabrik · 2026-08-04

  • OpenStreetMap Lahore green-space acquisition

    Seven pinned Overpass responses preserve parks, gardens, playgrounds, nature reserves and recreation grounds across a tiled Lahore query. The transformation metadata records every tile, hash, source timestamp, district gate and output hash. OSM is a community map. It does not establish ownership, public access, maintenance duty or current condition.

    OpenStreetMap contributors · 2026-08-03

  • OpenStreetMap Lahore rapid-transit route relations

    Pinned full route relations preserve corridor segments and 53 station points for the Orange Line and Lahore Metrobus. PMA confirms route identity and station counts. OSM supplies the displayed community-map geometry.

    OpenStreetMap contributors · 2026-08-03

  • OpenStreetMap Lahore road-control and crossing points

    The pinned Pakistan shapefile was filtered to 975 traffic signals, crossings, junctions, one mini roundabout and one mapped street light inside the official PULSE Lahore district polygon. It supplies map context only. It is not an official road-asset register.

    OpenStreetMap contributors via Geofabrik · 2026-08-04

  • OpenStreetMap Lahore highways and named-area acquisition

    The metadata preserves the exact Overpass queries, build date and output hashes. The compressed raw responses sit beside it. OSM describes mapped features. It does not establish public ownership, maintenance duty, scheme approval or legal jurisdiction.

    OpenStreetMap contributors · 2026-08-03

  • OpenStreetMap feature for Shadman Main Market

    The point used by the finder is the Nominatim centroid of the mapped commercial area. Its town result is a point-in-polygon reconstruction.

    OpenStreetMap contributors · 2026-08-01

  • Punjab Education Foundation current Lahore partner schools

    The directory contains 237 current Lahore partner rows: 89 Foundation Assisted Schools, 138 Education Voucher Scheme schools and 10 New School Programme schools. PEF does not publish street addresses or coordinates in this directory. The rows are searchable, but a school name alone is not enough to place a partner school on the map.

    Punjab Education Foundation · 2026-08-04

  • PEPRIS Lahore private-school public registry

    The public registry endpoint returned 8,073 Lahore private-school records across City, Model Town, Cantt, Shalimar and Raiwind tehsils. The archive preserves school name, level, gender, registration number where published, licence state and date, tehsil and address. The registry does not publish coordinates. A map link therefore requires a separate identity and location review.

    School Education Department, Government of the Punjab · 2026-08-04

  • Lahore feeder-route pages and stop sequences

    Acquisition manifest for the 15 FRT route pages linked from PMA's Lahore Phase I feeder-route index on the retrieval date. Each route page is archived and hashed separately. The pages publish route endpoints and ordered stop labels. They do not prove a live timetable, present operation or route geometry. The index did not list FRT01, FRT02 or FRT06 on the retrieval date, so this record does not silently recreate them.

    Punjab Masstransit Authority · 2026-08-03

  • PULSE District Lahore Boundary FeatureServer metadata

    The public service reports Query capability and WGS84 output. It does not publish lineage, drawing authority or an effective date.

    Government of Punjab PULSE programme · 2026-08-03

  • PULSE Lahore district boundary query result

    The live query returned one polygon feature named Lahore with a 904-coordinate outer ring. The response was stored verbatim. No simplification or redrawing was performed.

    Government of Punjab PULSE programme · 2026-08-03

  • PULSE District Lahore Boundary layer metadata

    Layer 1 is named District_Boundary and reports polygon geometry. The metadata does not identify the legal instrument or agency that drew the boundary.

    Government of Punjab PULSE programme · 2026-08-03

  • Lahore tehsil source geometry

    The official-hosted layer returns ten Lahore tehsil polygons. Its metadata gives no legal effective date and identifies no current legal boundary instrument.

    Punjab Urban Land Systems Enhancement Project · 2026-08-01

  • PULSE Combined LDA and Local Government map layer

    Layer 0 is named Combined_LDA_Local_Govt. Its fields are Landuse, Name and District_N. The ordinary query operation failed despite the advertised capability. Export and identify worked. The archive preserves every identify response used to recover exact feature geometry. The service does not state an effective date, legal instrument, author or lineage.

    Government of Punjab PULSE programme · 2026-08-03

  • Punjab Mouza Boundary feature layer

    The public query returned 362 Lahore mouza polygons. We joined them to the 2026 Gazette list to reconstruct the town layer. No issued 2026 boundary map has been found.

    Punjab Urban Land Systems Enhancement, Government of the Punjab · 2026-08-01

  • Punjab public health facility APIs: Lahore register and sanitized coordinate extract

    The provenance file records the five official API endpoints, their archived-response hashes and the exact filter. The raw responses are not copied into the public repository because they contain internal creator and user identifiers that are not needed for the public map. The sanitized GeoJSON keeps 77 points from 142 Lahore rows. Sixteen non-empty coordinate pairs were rejected as obvious placeholders or outside the broad Lahore region. Three more were quarantined because they fall outside the pinned PULSE Lahore district polygon.

    Health Information Service Delivery Unit, Health and Population Department, Government of the Punjab · 2026-08-02

  • Punjab Transit legacy Lahore feeder-route context

    The archive retains four feeder routes whose route numbers and endpoints still match the PMA records checked on 3 August 2026. The legacy paths are road-following reconstructions. They are not PMA-published geometry and do not prove a current path, stop coordinate, timetable or vehicle position. Routes with changed endpoints were excluded.

    Punjab Transit side project supplied by the user · 2026-08-04

  • SIS Punjab Lahore markaz directory by tehsil

    The normalized checked copy is preserved in this repository. The five underlying public endpoint responses remain in the LSRW research archive. It names 58 markazes across five SIS tehsils. It does not publish markaz polygons.

    School Education Department, Government of the Punjab · 2026-08-03

  • SIS Punjab Lahore public-school directory by markaz

    The normalized checked copy is preserved in this repository. The 58 underlying public endpoint responses remain in the LSRW research archive. It contains 1,028 school-to-markaz rows with name and EMIS code, but no address, coordinate or admission catchment.

    School Education Department, Government of the Punjab · 2026-08-03

  • SNGPL organisational structure chart

    The chart says it was approved by the Board at its 625th meeting on 26 July 2024. It places both Lahore General Managers under SGM Distribution South and DMD Operations.

    Sui Northern Gas Pipelines Limited · 2026-08-03

Election order2
  • ECP schedule for delimitation of wards in 42 Cantonment Boards

    The schedule names Lahore and Walton among 42 Cantonment Boards. It sets 20 April 2026 for publication of final ward lists. It does not contain the final lists or ward maps.

    Election Commission of Pakistan · 2026-08-02

  • ECP order on delayed Punjab local-government election inputs

    This is a historical blocker record. The order says the Punjab election rules and updated delimitation maps were still awaited on 5 March 2026. It gave Punjab a final deadline of 12 March. Later records show that the rules were made and delimitation proceeded.

    Election Commission of Pakistan · 2026-08-02

Gazette4
  • Corrigendum to Lahore demarcation Notification 24 of 2026

    The corrigendum occupies PDF pages 16 to 22 and changes named mauza populations and all nine town totals.

    Government of the Punjab, Local Government and Community Development Department · 2026-08-01

  • Appointment of administrators for local governments

    Notification SOR(LG)1-11/2019 appoints the Deputy Commissioner Lahore as administrator of Metropolitan Corporation Lahore. Continued effect is an inference from PLGA 2025 sections 191 and 196. The official catalogue checked on 2 August 2026 showed no later replacement and may be incomplete.

    Government of Punjab, Local Government and Community Development Department · 2026-08-01

  • The Punjab Local Government Act 2025

    Act LXXX of 2025. Published in the Gazette of the Punjab (Extraordinary). The official scan is 81 pages and has no embedded text layer.

    Provincial Assembly of the Punjab · 2026-08-01

  • The Suthra Punjab Authority Act 2026

    Act XII of 2026. Published in the Gazette of the Punjab (Extraordinary). Section 26 creates a conditional succession process for Waste Management Companies. It does not itself supply the Authority's transfer date or the Director General's succession order.

    Provincial Assembly of the Punjab · 2026-08-02

Notification2
Observation2
  • Lahore Police station location cross-checks

    The observation records six station points that were checked against the official Lahore Police directory. It prevents same-name errors such as sending Gujjar Pura to an unrelated locality. These are reconstructed public map points. They are not official building coordinates or station jurisdictions.

    The Local State research cross-check · 2026-08-04

  • Sanitized Shadman utility-bill label observations

    The public file retains only service-area, network and billing-route labels. It excludes names, exact addresses, account and reference numbers, meter numbers, property identifiers, page numbers and connection-specific delivery ordering. One household observation can verify what a bill says for that connection. It cannot establish a citywide boundary.

    LESCO, WASA Lahore, Lahore WMC and SNGPL bills supplied privately to The Local State · 2026-08-03

Other6
Regulation3
  • LDA building regulations

    Establishes building-permission and compliance rules within LDA jurisdiction. A plot-level answer still needs the current land-use and application record.

    Lahore Development Authority · 2026-08-01

  • NEPRA determination and Distribution Licence DL/03/2023 for LESCO

    The licence gives LESCO's five-district territory and a map of eight geographic circles. The scanned map is useful as an official reference. It is not a checked digital boundary.

    National Electric Power Regulatory Authority · 2026-08-02

  • NEPRA determination on LESCO tariff under revised annual rebasing timelines

    Determines a provisional LESCO revenue requirement for July to December 2026. The distribution margin is not a provincial budget allocation or the resident's complete consumer tariff.

    National Electric Power Regulatory Authority · 2026-08-02

Report76
  • Audit Report on Petroleum Division and OGRA, Audit Year 2024-25

    The Lahore complaint paragraph is an audit observation for FY2023-24. It is not a current complaint count or a final loss finding.

    Auditor-General of Pakistan · 2026-08-03

  • Audit Report on the Accounts of Public Sector Companies and Local Governments of the Punjab (North), Audit Year 2023-24

    Chapter 3 covers LWMC, principally for FY2022-23. Audit observations are unresolved findings for response and review. They are not treated as final loss or proven wrongdoing.

    Auditor-General of Pakistan · 2026-08-02

  • Performance Audit Report on Punjab Emergency Services (Rescue 1122)

    The checked copy is preserved in the LSRW research archive. Paragraph 4.1.8 records tower-based routing, the absence of a wrong-landed-call SOP and the WAPDA Town-to-Sahiwal case. These findings are audit-dated and do not establish the present SOP status.

    Auditor General of Pakistan · 2026-08-03

  • Asian Infrastructure Investment Bank · 2026-08-02

  • Updated ESIA for the sewerage system from Larech Colony to Gulshan-e-Ravi

    The date is the PDF creation date. Section 3.2 describes the planned Line-B route and names the disposal stations whose sewage it is designed to collect. This is project evidence, not a current field-circle boundary.

    Water and Sanitation Agency Lahore · 2026-08-02

  • ESIA annexures for the Lahore Wastewater and Drainage Management Project

    The checked file is preserved in the LSRW research archive. The June 2024 Annexure I sheet labels SHADMAN D/S. The August 2024 Annexure XIX revised-alignment sheet labels the same station with the legend category ELIMINATED DISPOSAL STATION. Both sheets are GeoPDF ArcMap exports with GEO measure dictionaries, GPTS control coordinates and embedded WGS 1984 UTM Zone 43N WKT.

    Water and Sanitation Agency Lahore · 2026-08-03

  • Asian Infrastructure Investment Bank · 2026-08-02

  • Water and Sanitation Agency Lahore · 2026-08-02

  • Draft ESIA for the Lahore Water and Wastewater Management Project water-supply packages

    Figures 4.17 and 4.18 reproduce GIS maps titled Lahore WASA Serving Area and Lahore WASA Tubewells. The plates were compiled by GIS Section, MMP on 16 January 2019 and attributed to the February 2019 final feasibility study. They are dated evidence of the represented service area and tube-well distribution, not proof of the 2026 boundary or current asset register.

    Water and Sanitation Agency, Lahore Development Authority, Government of Punjab · 2026-08-03

  • ECP issues delimitation schedule for 42 Cantonment Boards

    Named official-news reporting supplies the schedule dates and says the exercise includes Lahore. The final ECP ward lists and maps are still required.

    Associated Press of Pakistan · 2026-08-02

  • LDA seals properties in Johar Town and other areas

    Reports a dated Town Planning Zone IV operation in Johar Town and Khayaban-e-Firdousi. It does not publish the complete zone boundary or a current property allocation table.

    Associated Press of Pakistan · 2026-08-05

  • LDA seals properties in Town Planning Zones I, II and III

    Reports dated enforcement work by Town Planning Zones I, II and III in Gulshan Ravi, Multan Road and Gulberg. It does not publish the complete zone boundaries or a current property allocation table.

    Associated Press of Pakistan · 2026-08-05

  • ECP releases revised schedule of demarcation of Union Councils in Punjab

    APP reported the revised Election Commission schedule. The official ECP press release of 31 July now corroborates the 17 August final-delimitation date and says objection hearings were complete.

    Associated Press of Pakistan · 2026-08-01

  • LG polls in cantonments: Defence ministry says ready to support ECP

    Named reporting from an ECP hearing. It reports the Defence Ministry counsel's position, a pending federal summary and the ECP bench's direction. A direct ECP order or hearing record was not located.

    Business Recorder · 2026-08-02

  • Initial list shows 433 UCs in Lahore

    Dawn reports that Lahore's district election commissioner issued the preliminary Union Council list on 2 June 2026. It reports 433 Union Councils across nine Town Corporations, with the same town totals assigned in the March Gazette order. The underlying ECP Form-I list and maps were not retrievable in this research environment, so this source verifies the reported publication state and totals but not individual Union Council boundaries.

    Dawn · 2026-08-01

  • ECP press release on local-government elections

    Preserved as part of the official ECP local-government election record. Use a reviewed Urdu transcription or translation before citing a detailed claim.

    Election Commission of Pakistan · 2026-08-02

  • ECP press release on Punjab local-government delimitation

    The official press release says Punjab objection hearings were complete. Decisions were to reach delimitation committees by 7 August. Final delimitation was scheduled for 17 August 2026. It says election-date consultation with Punjab would begin immediately afterward.

    Election Commission of Pakistan · 2026-08-02

  • Project for Improving the Capacity of WASAs in Punjab Province, Project Completion Report

    The report records subdivision-level training, leakage work, complaint handling and field SDO involvement across Punjab WASAs. It is supporting operating context, not a boundary register.

    Japan International Cooperation Agency · 2026-08-05

  • Preparatory Study on Lahore Water Supply, Sewerage and Drainage Improvement Project, Final Report, Volume 1

    Chapter 6 distinguishes O&M areas, water-supply control areas and sewerage service areas. Table 6.1 gives the 25-subdivision O&M schedule and area totals as of May 2009.

    Japan International Cooperation Agency · 2026-08-05

  • Preparatory Study on Lahore Water Supply, Sewerage and Drainage Improvement Project, Japanese Summary

    Figure 6.1 preserves the May 2009 O&M directorate and subdivision boundary map. English labels within the figure are legible even though the report text is Japanese.

    Japan International Cooperation Agency · 2026-08-05

  • Environmental Impact Assessment for the Jail Road and Main Boulevard Lahore improvement project

    The January 2015 project record names LDA as proponent and includes remodelling of Main Boulevard among the works. It proves historical LDA project involvement. It does not establish the current owner, maintainer, engineering division or work order for Main Boulevard Shadman.

    Lahore Development Authority · 2026-08-05

  • LDA Shadman commercial-road segment record

    Identifies Main Boulevard Shadman as a regulated commercial-road segment. A specific plot application still needs its own decision record.

    Lahore Development Authority · 2026-08-01

  • LDA road-segment list for Main Boulevard Shadman

    PDF page 24 identifies the west-side Jail Road to Nallah Drain market-side segment. The document calls itself a vision, says it is not legal and says the relevant notification prevails. Current ownership and maintenance need separate evidence.

    Lahore Development Authority · 2026-08-05

  • LESCO Medium Term Energy and Demand Forecast 2024-25 to 2034-35

    The report identifies the Shadman 132 kV grid station as grid 191 and reports its installed transformer capacity and forecast demand. It does not assign consumer addresses to subdivisions or feeders.

    Lahore Electric Supply Company Limited, Market Implementation and Regulatory Affairs Department · 2026-08-02

  • Public copy of a LESCO current load management program

    The schedule text links G.O.R Sub-Division, 132 kV Shadman grid station, Shadman Market feeder and feeder code 19105. The file is not hosted on LESCO's current public domain, so it is supporting evidence rather than the sole basis for the field-unit assignment.

    Lahore Electric Supply Company, mirrored by Pakistan Observer · 2026-08-03

  • LESCO State of Industry data 2024

    The table reports company-wide field-unit and feeder counts as at 30 June 2023 and 30 June 2024. It does not provide Lahore-district totals or unit boundaries.

    Lahore Electric Supply Company Limited · 2026-08-02

  • LWMC Eid-ul-Adha 2025 operating plan

    Names Shadman Main Boulevard, Shadman Chowk, Shadman underpass and Shadman Market in operating routes. The source is an Eid plan. The current ordinary-day contract remains open.

    Lahore Waste Management Company · 2026-08-01

  • National Assembly of Pakistan, Assembly Debates, 10 June 2026

    Question 129 appears on PDF pages 31 to 33, printed pages 28 to 30. The ministerial answer records the 20 October 2025 enactment, Punjab's provision of essential delimitation data, the ECP's sixth delimitation schedule dated 15 April 2026, a stated final-list date of 10 August 2026, and that the ECP had not requested additional resources or personnel at that stage. The cited annexures were placed in the National Assembly Library and are not included in this PDF.

    National Assembly of Pakistan · 2026-08-01

  • NEPRA decision naming the Badami Bagh Division XEN

    The copy list names Badami Bagh Division. The hearing record names Faizan Ali as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Baghbanpura Division XEN

    The copy list names Baghbanpura Division. The hearing record names Ibrahim Mufti as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Civil Lines Division XEN

    The hearing record names Shujaat Ali as XEN Civil Lines. It is a dated observation, not a current posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision corroborating the Civil Lines Division XEN

    The hearing record names Shujat Ali as XEN Operation, Civil Line. It corroborates the cleaner Shujaat Ali spelling in the October decision. It is not a current posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Defence East Division XEN

    The copy list names Defence East Division. The hearing record names Ashafaq Hussain as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Defence East Division XEN

    The copy list names Defence East Division. The hearing record names Ashfaq Ahmad as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Feroz Wala Division XEN

    The copy list names Feroz Wala Division. The hearing record names Sirajuddin as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Feroz Wala Division XEN

    The copy list names Feroz Wala Division. The hearing record names Saadat as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA complaint decision naming the LESCO field office chain

    The copied action list names LESCO's Customer Services Director, complaint cell, circle Superintending Engineer and divisional Executive Engineer. It supports the stable escalation offices. It does not identify every current holder.

    National Electric Power Regulatory Authority · 2026-08-04

  • NEPRA decision naming an SDO in a G.O.R Sub-Division complaint

    The hearing record names Usman Qadeer as SDO and carries complaint reference code 11252. LESCO's official field directory separately maps 11252 to G.O.R Sub-Division. The joined assignment is reconstructed and historical.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Gulberg Division XEN

    The copy list names Gulberg Division. The hearing record names Fiaz Hussain as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Gulberg Division XEN

    The copy list names Gulberg Division. The hearing record names Muhammad Tahir as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Gulshan-E-Ravi Division XEN

    The copy list names Gulshan-E-Ravi Division. The hearing record names Nauman Bhatti as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Gulshan-E-Ravi Division XEN

    The copy list names Gulshan-E-Ravi Division. The hearing record names Nauman Bhatti as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Gulshan-E-Ravi Division XEN

    The copy list names Gulshan-E-Ravi Division. The hearing record names Muhammad Farooq as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Gulshan-e-Ravi Division XEN

    The copy list names Gulshan-e-Ravi Division. The hearing record visibly names Muhammad Farooq as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Johar Town Division XEN

    The copy list names Johar Town Division. The hearing record names Ahmad Faraz as the XEN respondent. This is a dated observation, not a posting order. The enclosed decision says January 1, 2025. The PDF filename says January 8, 2025.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Kot Abdul Malik Division XEN

    The copy list names Kot Abdul Malik Division. The hearing record names Qurban Ali as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Kot Abdul Malik Division XEN

    The copy list names Kot Abdul Malik Division. The hearing record names Naeem Qasim as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Kot Lakhpat Division XEN

    The copy list names Kot Lakhpat Division. The hearing record names Amjad Hussain Nagra as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Kot Lakhpat Division XEN

    The copy list names Kot Lakhpat Division. The hearing record names Amjad Hussain Nagra as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Kot Lakhpat Division XEN

    The copy list names Kot Lakhpat Division. The hearing record names Amjad Nagra as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision corroborating the Kot Lakhpat Division XEN

    The copy list names Kot Lakhpat Division. The hearing record again names Amjad Nagra as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Mughalpura Division XEN

    The copy list names Mughalpura Division. The hearing record names Aizazullah as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Mughalpura Division XEN

    The copy list names Mughalpura Division. The hearing record names Aizazullah as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Raiwind Division XEN

    The copy list names Raiwind Division. The hearing record names Ali Raza as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Raiwind Division XEN

    The copy list names Raiwind Division. The hearing record names Ali Raza as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Raiwind Division XEN

    The copy list names Raiwind Division. The hearing record names Ali Raza as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Raiwind Division XEN

    The copy list names Raiwind Division. The hearing record visibly names Ali Raza as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Ravi Road Division XEN

    The copy list names Ravi Road Division. The hearing record names Sooban Siddique as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Ravi Road Division XEN

    The copy list names Ravi Road Division. The hearing record names Sooban Siddique as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Ravi Road Division XEN

    The copy list names Ravi Road Division. The hearing record names Sooban Siddique as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Ravi Road Division XEN

    The copy list names Ravi Road Division. The hearing record names Sooban Siddique as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Ravi Road Division XEN

    The copy list names Ravi Road Division. The hearing record names Sooban Siddique as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming a later Ravi Road Division XEN

    The copy list names Ravi Road Division. The hearing record names Miraj Khalid as the XEN respondent. This is a later dated observation, not a tenure boundary.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Shalamar Division XEN

    The copy list names Shalamar Division. The hearing record names Umar Raza as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Shalamar Division XEN

    The copy list names Shalamar Division. The hearing record names Faizan Butt as the XEN respondent. This is a dated observation, not a posting order.

    National Electric Power Regulatory Authority · 2026-08-05

  • NEPRA decision naming the Shalamar Division XEN

    The decision is dated June 18, 2026. Its copy list names Shalamar Division and its hearing record names Faizan Butt as the XEN respondent.

    National Electric Power Regulatory Authority · 2026-08-05

  • District Lahore Emergency Contingency Plan for Disaster

    The checked copy is preserved in the LSRW research archive. Its ambulance and fire tables name 17 Lahore community rescue stations. This is a dated disaster-resource roster, not a current catchment schedule.

    District Emergency Office, Rescue 1122 Lahore · 2026-08-03

  • LDA seals properties in Shadman and Gulshan-e-Ravi

    Reports a dated LDA enforcement action in Shadman supervised by Director Town Planning Zone-I. It does not establish the current zone boundary, scheme, land-use class or responsible office for a specific plot.

    ProPakistani · 2026-08-03

  • LDA seals properties during a Lahore enforcement operation

    Reports a dated LDA Town Planning Wing operation that included Shadman. The reported total combines Shadman with GT Road and Gujjarpura. It does not establish a Shadman boundary or the office responsible for a specific plot.

    ProPakistani · 2026-08-03

  • Terms of reference for operations and maintenance of electric buses in Lahore

    Punjab Transport Company describes its 27-bus pilot on the 27-kilometre Green Town to Railway Station route and expressly states that it touches Shadman Market. It also states planned service hours of 06:00 to 22:00 and an approximate daily ridership of 20,000. The document was confirmed through Punjab Transport Company's official file index, but the PDF could not be archived through the current route. A current stop-level GIS, live timetable and vehicle feed were not acquired.

    Punjab Transport Company · 2026-08-03

  • LESCO chief executive describes Ramadan supply arrangements

    Names Engineer Muhammad Ramzan Butt as LESCO chief executive on 18 February 2026. It is a dated holder observation, not an appointment order.

    Radio Pakistan · 2026-08-04

  • SNGPL Annual Report 2025

    Exact official report. It states the company activity, Lahore East and West regional office address, OGRA licence relationship and named management at the report date.

    Sui Northern Gas Pipelines Limited · 2026-08-02

  • SNGPL disconnected industrial and commercial defaulters report

    The header says the arrears data run to September 2025. The report's Region column assigns one consumer address at 98 Shadman I to Lahore-East. This account observation supports a neighbourhood reconstruction; it is not a published service boundary.

    Sui Northern Gas Pipelines Limited · 2026-08-03

  • Illegal structures demolished and sealed by LDA

    Reports a dated Town Planning Zone V operation in Jubilee Town, LDA Avenue-I, Raiwind Road, Rohi Naala and TIP Society. It is an old operational observation, not a current zone map.

    The News International · 2026-08-05

  • Mapping of Solid Waste Management Services in Punjab

    Chapter 5 records Lahore Division's solid-waste operating model as observed in 2025. Its four Lahore labels are operating table labels. They are not the current ten-tehsil legal boundary layer and are not GIS geometry.

    The Urban Unit, Planning and Development Board, Government of Punjab · 2026-08-02

  • WASA Lahore transformation overview

    The opening states that WASA Lahore now functions under the Punjab Water and Sanitation Authority Act 2025. It also reports citywide system totals. We have not treated those totals as an asset register.

    Water and Sanitation Agency Lahore · 2026-08-02

Rule4
Webpage167
  • Lytton Road SHO named in custodial death report

    The report directly identifies Sohail Ikhlaq as Lytton Road SHO. It supports a dated holder observation only.

    Aaj English TV · 2026-08-06

  • Lahore SHO relieved of duties following complaint by judicial officer

    The report explicitly identifies Faryad Ashraf as Defence C SHO immediately before his removal. It does not identify his replacement.

    Abb Takk News · 2026-08-08

  • CM suspends DSP, SHO over injury by kite string

    The Lahore-datelined report says the chief minister ordered the suspension of Shad Bagh SHO Ibrar after a kite-string injury in Misri Shah. It identifies the holder immediately before the reported suspension. The cached source was checked against SHA-256 d93fd5dabb0e531424c14b27b10a94e7a1df319ca596644dcc00858aae85b09c. It does not establish when the posting began, when the suspension took effect or who succeeded him.

    Associated Press of Pakistan · 2026-08-08

  • Shafiq Abad SHO named in complaint refusal report

    The report directly identifies Imran Qamar as Shafiq Abad SHO. It supports a dated holder observation only.

    ARY News Urdu · 2026-08-06

  • Wahdat Colony SHO named in arrest report

    The report directly identifies Mubashir Ali as Wahdat Colony SHO on the date of his arrest. It supports a dated holder observation only.

    Business Recorder · 2026-08-06

  • Model Town police arrest two proclaimed offenders

    The report quotes Faheem Imdad as SHO Model Town on 2 March 2022. The source does not use the additional-SHO qualifier. This is a dated holder observation, not a complete tenure.

    Daily Pakistan · 2026-08-08

  • Chung SHO named in performance report

    The report directly identifies Hammad Butt as Chung SHO. It supports a dated holder observation only.

    Daily Pakistan · 2026-08-06

  • Civil Lines SHO named in police action report

    The report directly identifies Inspector Babar Ashraf Ansari as Civil Lines SHO. It supports a dated holder observation only.

    Daily Pakistan · 2026-08-06

  • Mughalpura SHO named in police action report

    The report directly identifies Inspector Mudassirullah Khan as Mughalpura SHO. It refers to Lahore Operations Police, not Mughalpura Railway Police.

    Daily Pakistan · 2026-08-06

  • Muslim Town SHO named in police action report

    The report directly identifies Inspector Rehan Anwar as Muslim Town SHO. It supports a dated holder observation only.

    Daily Pakistan · 2026-08-06

  • Sabzazar SHO named in police action report

    The report directly identifies Inspector Shahzeb as Sabzazar SHO. It supports a dated holder observation only.

    Daily Pakistan · 2026-08-06

  • Service penalties ordered for named Lahore SHOs

    The report identifies twelve serving Lahore SHOs while recording service penalties for poor performance. The headline says thirteen, but the accessible body names twelve officer and station pairs. Only those twelve pairs are imported as dated holder observations. The report does not establish appointment or departure dates. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • Nine SHOs relieved from stations for a specialist promotion course

    The report identifies nine stations whose SHOs were relieved for a specialist course. It publishes both the officer and station for six rows. The officers at Missri Shah, Naulakha and Mustafa Abad are omitted, so those three stations are not imported. The six named rows are dated holder observations, not appointment events or tenure ranges. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • SHOs of Sarwar Road and Gujjar Pura suspended

    The report directly identifies the serving SHOs of Sarwar Road and Gujjar Pura when recording their suspension. These become dated holder observations only. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • Shadbagh SHO named in police action report

    The report directly identifies Inspector Chaudhry Maqsood Gujjar as Shadbagh SHO on 25 August 2022. It is imported as a dated holder observation only. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • Named Lahore SHOs recognised during performance review

    The report names the serving SHOs of Iqbal Town and Nishter Colony while recording performance awards. Other stations are mentioned without officer names and are not imported. The two named rows are dated holder observations only. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • Named Lahore SHOs recognised for performance

    The report identifies the serving SHOs of Naseerabad, Garden Town, Ichhra and Gulberg while recording performance awards. These are dated holder observations only. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • Lahore SHOs obtain new station postings

    The report says the named officers obtained their postings one day before publication, establishing an order date of 18 April 2021. It names ten appointments from Police Lines or other branches and two direct station-to-station moves. The two direct moves also identify the outgoing station holders immediately before the order. Names are transliterated from Urdu. The report's evaluative claims about officers are not imported.

    Daily Pakistan · 2026-08-08

  • Lahore SHOs and additional SHOs transferred

    The report names six incoming SHO or additional-SHO assignments. Five direct moves identify the officers' immediately preceding station assignments, and a further fifteen named SHOs or additional SHOs were ordered to Police Lines. Incoming postings and outgoing holder observations are preserved separately. Additional-charge status is retained where the report states it. Names are transliterated from Urdu. The report does not establish complete tenure.

    Daily Pakistan · 2026-08-08

  • New SHOs appointed at Lahore police stations

    The report publishes 33 named incoming station assignments. Fourteen of the same order's officer and station pairs are already preserved from the 11 August Daily Jang report. This source imports the remaining nineteen pairs so the same posting event is not duplicated. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • Four SHOs appointed in Lahore

    The report names four incoming station assignments ordered after interviews by the DIG Operations Lahore. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • Three SHOs appointed on administrative grounds

    The report names three incoming station assignments ordered by the DIG Operations Lahore. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • Three Lahore SHO appointments and one outgoing holder

    The report names incoming appointments at Mustafa Abad, Lohari Gate and Liaqat Abad. It also identifies the outgoing Mustafa Abad holder. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • Three SHO appointments and transfers

    The report names three incoming station assignments. It also sends Inspector Sharjeel Zia to Police Lines without identifying his prior station, so that line is not imported. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • New SHOs appointed at three police stations

    The report names three incoming station assignments. It also identifies Inspector Sagheer Ahmad as the outgoing Data Darbar SHO before he was sent to Police Lines. That row becomes a dated holder observation. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • Lahore SHO transfers and appointments

    The report names eight incoming station assignments and five outgoing station holders who were demoted, suspended or sent to Police Lines. Incoming rows are posting reports. Outgoing rows are dated holder observations only. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • Four Lahore SHO postings including Bata Pur and Bhatti Gate

    The report names four incoming SHO assignments and identifies Zia-ul-Haq as the outgoing Bhatti Gate holder. Names are transliterated from Urdu.

    Daily Pakistan · 2026-08-06

  • Six Lahore station house officers appointed

    The report directly names six incoming station house officer appointments. Names are transliterated from Urdu. The report does not establish complete tenure.

    Daily Pakistan · 2026-08-08

  • Woman Power: Lahore gets female SHO after 17 years

    The report states that Sub-Inspector Nabila Kausar was appointed SHO of Women Race Course Police Station. Daily Times independently reported the same appointment on 21 May 2017. The observation is dated to this source's publication date and does not establish how long she served.

    Daily Pakistan · 2026-08-08

  • Race Course SHO named after Kinnaird concert

    The report directly quotes Race Course SHO Raza Abbas. It supports a dated holder observation only.

    Dawn · 2026-08-06

  • Three SHO appointments and transfers, two sent to Police Lines

    The report names three incoming station assignments. It also identifies the outgoing holders at Defence Area B, Nawan Kot and Yakki Gate. The latter become dated holder observations and do not imply tenure. Names are transliterated from Urdu.

    Daily Dunya · 2026-08-06

  • Seventeen Lahore SHOs and three police-post in-charges changed

    The published text names nine incoming station appointments and nine outgoing station holders through direct moves or transfer to Police Lines. It does not reproduce all 17 SHO names stated in the headline. Police-post appointments are excluded. Names are transliterated from Urdu. The report does not establish complete tenure.

    Roznama Dunya · 2026-08-06

  • Several Lahore station house officers transferred and posted

    The report names 13 incoming station house officer appointments. Eight direct station-to-station moves also identify the officers as holders of their previous stations immediately before the order. Both evidence classes are preserved separately. Names are transliterated from Urdu. The report does not establish complete tenure.

    Roznama Dunya · 2026-08-08

  • ECP notifies schedule for delimitation of wards in 42 Cantonment Boards

    The official page verifies the announcement and embeds the direct ECP schedule. The attached order is preserved and cited as a separate source record.

    Election Commission of Pakistan · 2026-08-02

  • Power-sector Customer Complaint Management System

    Publishes the electricity contact centre number 118 and SMS short code 8118.

    Power Information Technology Company · 2026-08-02

  • SHOs of Lahore's 84 police stations changed

    The report says all 84 Lahore station house officers were changed. Its published text names 31 destination station assignments. Only those named assignments are imported. The remaining stations stay unresolved for this event. Names were transliterated from the Urdu report and the Urdu spellings remain available at the cited source.

    Express News · 2026-08-06

  • DIG reshuffles 16 SHOs in Lahore

    The report was published on 3 March 2020 and says the order was issued on Monday, 2 March 2020. It names seven incoming station assignments from that order. It also recaps an earlier December order without a precise date. Only the seven dated March destinations are imported here.

    The Express Tribune · 2026-08-06

  • Lahore police arrest ride-hailing driver for allegedly harassing woman

    The report explicitly names Rana Muhammad Irfan as Sarwar Road SHO on the publication date. It establishes a dated holder observation, not the beginning or end of his tenure.

    The Express Tribune · 2026-08-08

  • Several Lahore station house officers changed overnight

    The report names 19 incoming station appointments. Eight of those moves also identify the officer's previous station. Both evidence classes are preserved separately. Inspector Rana Mujahid is the only officer whose rank is stated in the published text. Names are transliterated from Urdu. The report does not establish complete tenure.

    Express Urdu · 2026-08-06

  • FortiGate URL filter documentation

    Explains local URL filters, block actions and the Local URLfilter Block log value.

    Fortinet · 2026-08-02

  • Lahore Police reshuffle and Shadman SHO change

    The report attributes the transfer and posting notification to DIG Operations Lahore and quotes the police spokesperson. It is a dated news observation, not the underlying posting order. It does not prove who holds the office now.

    Grand Lines · 2026-08-04

  • Lahore: 22 police officers transferred

    The report transcribes a Lahore DIG Operations notification affecting 22 officers. It names 14 incoming station appointments and 12 outgoing station holders. Four officers moved directly between named stations, which is why the report supports 26 station-level observations. Additional SHO appointments remain additional-charge. Names were transliterated from the Urdu report and the published Urdu spellings remain available at the cited source.

    Hum News · 2026-08-06

  • Five new Lahore SHOs appointed

    The report names five incoming station assignments and identifies Nasir Khan as the outgoing Chung SHO. Names are transliterated from Urdu.

    Daily Jang ePaper · 2026-08-06

  • Three Lahore SHO appointments and outgoing holders

    The report names incoming appointments at Shafiq Abad, Millat Park and Town Ship. It also identifies the three outgoing station holders. Names are transliterated from Urdu.

    Daily Jang ePaper · 2026-08-06

  • Bata Pur SHO among three police officers suspended

    The report directly identifies Inspector Hafiz Muhammad Aneeq as Bata Pur SHO when recording his suspension. This is a dated holder observation, not a tenure range.

    Daily Jang · 2026-08-06

  • Lahore: appointments and transfers of SHOs at 32 police stations

    The headline says 32 Lahore police-station SHOs were appointed or transferred. The published body supplies 14 unambiguous officer and destination-station pairs. Two more lines omit a usable station identity. Those ambiguous rows and the remaining names absent from the body are not imported. Names are transliterated from Urdu.

    Daily Jang · 2026-08-06

  • Eleven more Lahore SHOs transferred

    The accessible report body names eight incoming assignments and three outgoing station holders. The headline count is not used to infer any missing pair. Names are transliterated from Urdu.

    Daily Jang · 2026-08-06

  • Three Lahore SHO appointments

    The report names incoming appointments at Manga Mandi, Raiwind City and Satto Katla. Names are transliterated from Urdu.

    Daily Jang · 2026-08-06

  • Eight Lahore station house officer transfers and postings

    The report names six incoming station house officer appointments and three outgoing station holders through direct moves or closure to Police Lines. Both evidence classes are preserved separately. Names are transliterated from Urdu. The report does not establish complete tenure.

    Daily Jang · 2026-08-08

  • Lahore police transfers from station house officers to muharrars

    The mixed transfer report explicitly identifies five station house officer appointments. Those five are imported. Entries that merely post an officer at a station, and all additional-SHO, police-post, general-duty and muharrar appointments, are excluded. Names are transliterated from Urdu. The report does not establish complete tenure.

    Daily Jang · 2026-08-08

  • Functions of the Deputy Commissioner Lahore

    Supports the district reporting line and the Deputy Commissioner's supervision of Assistant Commissioners. Municipal service ownership needs separate evidence.

    District Administration Lahore · 2026-08-02

  • Lahore Deputy Commissioners and former District Coordination Officers

    Supports the current Deputy Commissioner's stated January 2026 start and the recent officeholder timeline.

    District Administration Lahore · 2026-08-02

  • District Lahore core team

    Dated transcription source for Assistant Commissioners and the listed district authority chief executives. The page names Dr. Asif Khan as CEO, District Health Authority. It gives no appointment date, and a separate official health-authority page still names Dr. Saeed Ullah Khan. The live core-team page was checked again on 4 August 2026 and still named Dr. Asif Khan.

    District Administration Lahore · 2026-08-02

  • Lahore district directorate

    Current directory source for the Deputy Commissioner, Additional Deputy Commissioners, territorial Assistant Commissioners, selected district institutions and published contact details. The page gives no update date.

    District Administration Lahore · 2026-08-02

  • CEO District Education Authority Lahore and Core Team

    The checked page defines the CEO as the Authority's principal accounting and chief operating officer. A same-day checked Core Team page names Tariq Mehmood. It gives no appointment date or instrument.

    District Government Lahore · 2026-08-03

  • District Health Authority, Lahore

    States the district authority's primary and secondary healthcare, public-health, budget and oversight functions. Current Lahore directory pages show conflicting CEO names, so this source does not settle the current officeholder.

    District Administration Lahore · 2026-08-02

  • Lahore Division core team

    Dated transcription source for the Commissioner and the divisional office branches. The page gives no update date. Officeholders and vacancies require regular review.

    Commissioner Lahore Division · 2026-08-02

  • Functions of the Commissioner Office, Lahore Division

    Supports the Commissioner's divisional coordination, revenue administration and provincial policy roles. Some wording still refers to District Coordination Officers and may predate the current statutory terminology.

    Commissioner Lahore Division · 2026-08-02

  • Seventeen Lahore station house officers transferred

    The report names 13 incoming station house officer appointments. Twelve direct moves or Anti-Riot Force transfers also identify the officers as holders of their previous stations immediately before the reported order. Both evidence classes are preserved separately. Names are transliterated from Urdu. The report does not establish complete tenure.

    Lahore News · 2026-08-08

  • Lahore Police core team directory

    The page names Bilal Siddique Kamyana as Capital City Police Officer, Lahore and Muhammad Faisal Kamran as DIG Operations Lahore. It is a dated directory observation. It does not establish either officer's appointment date.

    Capital City Police Lahore · 2026-08-03

  • DIG Operations Lahore profile

    The page names Muhammad Faisal Kamran as DIG Operations Lahore and describes the office's place in the operational chain. It is a dated directory observation. It does not establish an appointment date.

    Capital City Police Lahore · 2026-08-03

  • Lahore Police divisional, circle and police-station directory

    The directory lists Shadman Police Station under Model Town Division and Ichhra Circle with phone 042-37589936. The station boundary remains open.

    Punjab Police · 2026-08-02

  • Lahore Development Authority current website

    Names Maryam Nawaz Sharif as Chairperson LDA and exposes current resident-facing services including approved schemes, illegal schemes, building plan approval and One Window status.

    Lahore Development Authority · 2026-08-04

  • LDA DG inspects uplift projects

    Names Asrar Saeed as LDA Chief Engineer and Iqrar Hussain as TEPA Chief Engineer during a dated inspection of development projects.

    The News International · 2026-08-04

  • Lahore Division Plan-2050 likely to be enforced from next fiscal

    Names Muhammad Faisal Qureshi as LDA Chief Metropolitan Planner and records that LDA was then using the Master Plan 2016 while reviewing the Lahore Division Plan 2050.

    Dawn · 2026-08-04

  • LDA One Window Cell contact and application status

    The page lists the Director One Window phone, two daily service shifts and online application-status checking. Complaint and appeal routes still depend on the planning case.

    Lahore Development Authority · 2026-08-02

  • LDA website: Traffic Engineering and Planning Agency

    The current LDA website identifies TEPA as a wing of LDA. It does not settle the present division of asset ownership, maintenance and operating responsibility among TEPA, City Traffic Police and road owners.

    Lahore Development Authority · 2026-08-02

  • LDA seals 203 illegal commercial buildings in Lahore

    Names Asad uz Zaman as Chief Town Planner I and Azhar Ali as Chief Town Planner II in a dated LDA enforcement report.

    Associated Press of Pakistan, republished by ProPakistani · 2026-08-04

  • Major revamping in LDA: Two CTPs appointed against one in Town Planning Wing

    Reports the LDA office order creating Chief Town Planner I and II and allocating Town Planning Zones I to III to CTP-I and Zones IV, V and VII to CTP-II. The current public boundaries of the zones were not acquired.

    The News International · 2026-08-04

  • LESCO Electronic Directory search page

    The live directory lists 16 circle entries, 67 division entries and 242 subdivision entries. The geographic and functional split is reconstructed from the numeric labels. The directory does not publish service boundaries.

    Lahore Electric Supply Company Limited · 2026-08-02

  • LESCO chief assures APTMA of uninterrupted electricity supply

    Dated management briefing naming LESCO senior officers present with the chief executive. It does not establish field-circle, division or subdivision holders.

    Associated Press of Pakistan, republished by UrduPoint · 2026-08-04

  • LESCO directory record for 132KV G/S Shadman

    Names the 132 kV Shadman grid station and gives a phone and resident engineer. It does not give coordinates or a parent circle, division or subdivision.

    Lahore Electric Supply Company Limited · 2026-08-02

  • Facilities Available for Obtaining Information

    Official departmental page listing public information channels. Web contact details can change and need a fresh check before use.

    Local Government and Community Development Department, Government of the Punjab · 2026-08-01

  • LGCD current leadership

    Dated official leadership cards for the Chief Minister, Chief Secretary, LGCD minister and LGCD secretary. The page gives no posting dates.

    Local Government and Community Development Department, Government of the Punjab · 2026-08-02

  • LGCD notifications catalogue

    The 2026 section lists the PLGA 2025 demarcation notification. No Lahore-specific 2025 Act administrator, staff, office, asset or fiscal transition instrument appears in the catalogue as checked. The catalogue may be incomplete.

    Local Government and Community Development Department, Government of the Punjab · 2026-08-02

  • LGCD rules catalogue

    The PLGA 2025 section links the demarcation, Union Council delimitation and local election rules used by the implementation tracker.

    Local Government and Community Development Department, Government of the Punjab · 2026-08-02

  • LWMC public services and complaint channels

    Describes municipal waste collection and disposal in Lahore and publishes helpline 1139. The current operator for a selected street remains open.

    Lahore Waste Management Company · 2026-08-01

  • CBCARE centres and citizen system

    The page states that CBCARE accepts and tracks applications and complaints, provides SMS updates, and includes a Walton centre. Property-level Board assignment remains open.

    Military Lands and Cantonments Department · 2026-08-02

  • Lahore-region Cantonment Boards

    Verifies Lahore and Walton as separate Cantonment Boards. Checked geometry for their present boundaries remains open.

    Military Lands and Cantonments Department · 2026-08-01

  • Lahore Cantonment Board profile

    The profile verifies the Board, its stated area, civil population, address, phone and examples of public infrastructure. A current machine-readable boundary or gazetted boundary description remains open.

    Military Lands and Cantonments Department · 2026-08-02

  • Walton Cantonment Board profile

    The profile verifies the Board, its stated area, civil population, address, phone and examples of public infrastructure. A current machine-readable boundary or gazetted boundary description remains open.

    Military Lands and Cantonments Department · 2026-08-02

  • NEPRA Consumer Complaint Management System

    The portal provides complaint registration. Its declaration requires the consumer to have first approached the concerned distribution company or licensee and not obtained redress.

    National Electric Power Regulatory Authority · 2026-08-04

  • NEPRA Provincial Office Lahore contact page

    The current contact page gives the Lahore office address, phone and Consumer Affairs email.

    National Electric Power Regulatory Authority · 2026-08-04

  • NEPRA distribution licensing register for LESCO

    Lists LESCO and four districts. The current 2023 licence names five districts by also including Nankana. We retain this page as a dated directory record and use the licence for the current territory claim.

    National Electric Power Regulatory Authority · 2026-08-02

  • OGRA natural-gas licensing register

    The official search index describes SNGPL under integrated licences. The exact OGRA page still returns HTTP 403 and has not been archived. The exact SNGPL Annual Report 2025 independently states the company's licence relationship with OGRA.

    Oil and Gas Regulatory Authority · 2026-08-02

  • GGHS Shadman Colony monthly monitoring visit, 21 March 2025

    The page anonymises personal details. Public reporting should use the operational totals and facilities, not try to reconstruct anonymised names or phone numbers. The public page's embedded browser map key was redacted from the local archive.

    Programme Monitoring and Implementation Unit, Punjab Education Department · 2026-08-03

  • DIG Operations approves postings of 40 Lahore SHOs

    The report says DIG Operations approved 40 transfers and postings on 7 September 2018 and directed the officers to take charge immediately. It names the officer and destination station in every case. The report does not publish service numbers, order numbers, assumption dates or later transfer dates.

    Pakistan Today · 2026-08-06

  • Provincial Disaster Management Authority functions

    States provincial policy, preparedness, response coordination, directions and technical assistance functions. The current Lahore district plan and district authority structure remain to be acquired.

    Provincial Disaster Management Authority, Punjab · 2026-08-02

  • PHA Lahore Engineering Directorate functions

    Names maintenance work in major parks, green belts and roundabouts, including irrigation, park lights and fixtures. It does not provide a complete asset register.

    Parks and Horticulture Authority Lahore · 2026-08-02

  • PHA Lahore functions

    Names park and green-area development and maintenance, festivals and exhibitions, and outdoor-advertising regulation.

    Parks and Horticulture Authority Lahore · 2026-08-02

  • PHA Lahore current team directory

    Lists the current published managing director, engineering directors, eight horticulture-zone leads and several named park project directors. It does not publish zone boundaries, appointment dates or a complete asset register. The official site's TLS certificate prevented a local archive through the checked route, so the source remains link-backed.

    Parks and Horticulture Authority Lahore · 2026-08-03

  • WASA complaint management system

    The page says complaints are recorded location-wise and assigned to the relevant XEN or SDO, with an SMS, feedback call and before-and-after field photos. The public page does not expose the internal geographic assignment table. Direct archival retrieval timed out on 4 August 2026.

    Punjab Information Technology Board · 2026-08-04

  • Lahore feeder routes

    Official PMA page listing Lahore feeder-route identifiers and endpoints. A dependable current stop-level GIS or GTFS feed was not acquired in this pass.

    Punjab Masstransit Authority · 2026-08-03

  • Lahore Metrobus system

    Official PMA system page. It identifies the Gajjumata to Shahdara corridor as 27 kilometres with 27 stations and 64 buses. It does not provide machine-readable route geometry, live arrivals or current disruption data.

    Punjab Masstransit Authority · 2026-08-03

  • Orange Line Metro Train system

    Official PMA system page. It identifies a 27.1 kilometre alignment with 26 stations. It does not provide a machine-readable alignment, live arrivals or current disruption data.

    Punjab Masstransit Authority · 2026-08-03

  • Planning and Development Board Right to Information page

    States the Board's RTI duty and links its designated Public Information Officers. The page was captured successfully after the network route changed on 2 August 2026.

    Planning and Development Board, Government of the Punjab · 2026-08-02

  • Lahore station house officer transfers and postings

    The report names eight incoming station house officer appointments. Two direct station-to-station moves also identify the officers as holders of their previous stations immediately before the reported move. Names are transliterated from Urdu. The report does not establish complete tenure.

    Pakistan News International, carrying an Independent News Pakistan report · 2026-08-08

  • Power Division organisations and distribution companies

    Lists LESCO among the electricity distribution companies and lists the federal power-sector bodies.

    Ministry of Energy, Power Division, Government of Pakistan · 2026-08-02

  • Interview of lady SHO Women Police Station Race Course Tooba Tariq

    The title and description published by the official Punjab Safe Cities Authority channel identify Tooba Tariq as SHO Women Police Station Race Course. Only the channel's text metadata is used. No continuity into 2022 is inferred.

    Punjab Safe Cities Authority · 2026-08-08

  • Aap Ki Baldia municipal services portal

    Verifies a general online route for municipal-service complaints. The exact pothole category and routing for the Shadman segment remain open.

    Government of Punjab · 2026-08-01

  • Chief Ministers of Punjab

    Official tenure history. The current entry names Maryam Nawaz Sharif and gives a start date of 26 February 2024.

    Office of the Chief Minister of Punjab · 2026-08-02

  • Zahid Akhtar Zaman assumes charge as Chief Secretary Punjab

    Official appointment report stating the assumption of charge and the Pakistan Administrative Service cadre. Current status is checked separately against the dated LGCD leadership page.

    Punjab Portal, Government of the Punjab · 2026-08-02

  • Communication and Works Department information under the RTI Act

    States the provincial roads and public-buildings functions and the CE to SE to XEN to SDO field hierarchy. It does not identify every Lahore asset assigned to the department.

    Communication and Works Department, Government of the Punjab · 2026-08-02

  • Punjab Emergency Service contact and management directory

    Archived by the bounded research workstream. The page names the current management, Lahore divisional and district emergency officers, Rescue Headquarters address and a feedback channel. It does not publish station catchments.

    Punjab Emergency Service Department · 2026-08-03

  • Introduction of Punjab Emergency Service (Rescue 1122)

    States the legal basis and province-wide emergency ambulance, rescue, fire and community response functions. It does not provide a current Lahore station or dispatch-area register.

    Punjab Emergency Service Department · 2026-08-02

  • Environment Protection Department, Government of the Punjab · 2026-08-02

  • Punjab Food Authority overview and functions

    States the authority's regulation, standards, licensing, inspection, enforcement and laboratory functions. District field assignments and asset registers remain open.

    Punjab Food Authority · 2026-08-02

  • Punjab Masstransit Authority mandate

    States that PMA plans, constructs, operates and maintains mass-transit systems and integrated public-transport routes.

    Transport and Masstransit Department, Government of Punjab · 2026-08-02

  • Who can lodge a complaint with the Punjab Ombudsman

    Supports a possible complaint route for maladministration, including neglect and delay. The 1050 helpline is separately described by the official site as a registration and guidance line.

    Office of the Ombudsman Punjab · 2026-08-01

  • IGP Police Complaint Center 1787

    Publishes 1787 as the IGP complaint route. Emergency response remains a separate 15 route.

    Punjab Police · 2026-08-01

  • Punjab Police emergency helplines

    Publishes Police Emergency 15, IGP Complaint Helpline 1787 and Lahore Police complaint contacts. Emergency response and complaints remain separate routes.

    Punjab Police · 2026-08-02

  • Punjab Police formations

    Supports the Punjab Police and Lahore Police institutional chain. A current station boundary for the selected point remains open.

    Punjab Police · 2026-08-01

  • Five Rescue 1122 stations inaugurated in Lahore

    Dated announcement naming Harbanspura, Shadbagh, the Walled City, Maraka and Kot Abdul Malik. It is not a current station register and does not provide exact addresses or catchments.

    Government of the Punjab · 2026-08-03

  • Punjab Water and Sanitation Authority core team

    Dated directory evidence. Names and assignments can change.

    Punjab Water and Sanitation Authority · 2026-08-02

  • Punjab Water and Sanitation Authority overview

    States that PWASA was established under the 2025 Act and is responsible for urban water-supply and sanitation systems across Punjab.

    Punjab Water and Sanitation Authority · 2026-08-02

  • Punjab Water and Sanitation Authority · 2026-08-02

  • SNGPL Board of Directors profiles

    The live page verifies the displayed Chairman and MD/CEO. Its wider roster contains 43 names against 13 in the audited 2025 report, so the complete current board is not reconstructed from this page.

    Sui Northern Gas Pipelines Limited · 2026-08-03

  • SNGPL uniform complaint number

    Publishes 1199 as the uniform phone number for complaint registration.

    Sui Northern Gas Pipelines Limited · 2026-08-02

  • SNGPL online complaint form

    The form puts ordinary complaints, leakage, fire, blast and non-consumer emergencies in one complaint intake. The same page displays 1199.

    Sui Northern Gas Pipelines Limited · 2026-08-03

  • SNGPL company offices directory, Lahore section

    Live directory observed on 3 August 2026. The Lahore section includes Lahore and Kasur offices. Its section heading is not a territorial boundary. Personal mobile numbers are not republished.

    Sui Northern Gas Pipelines Limited · 2026-08-03

  • SNGPL Lahore regional offices and service centres

    Lists Lahore East and Lahore West management and current Lahore subregional, service-centre and complaint-centre locations. It does not publish their boundaries.

    Sui Northern Gas Pipelines Limited · 2026-08-02

  • Licence of SNGPL

    SNGPL states the issuing authority, licence number and validity dates. This page is not the licence instrument and does not publish its activities, schedules, territory or conditions.

    Sui Northern Gas Pipelines Limited · 2026-08-03

  • SNGPL message from the Managing Director

    The live page displayed Amer Tufail as Managing Director and CEO when checked. It does not state his appointment instrument.

    Sui Northern Gas Pipelines Limited · 2026-08-03

  • Suthra Punjab complaint page

    Publishes helpline 1139 for waste management, sanitation issues and service disruptions.

    Suthra Punjab Authority · 2026-08-02

  • Suthra Punjab official public-service homepage

    Publishes helpline 1139, a complaint form, complaint tracking and the Suthra Punjab Shehri app. Province-wide operating figures on the page are self-reported and are not used as audited performance data.

    Government of Punjab, engineered by Punjab Information Technology Board · 2026-08-02

  • TEPA core team

    Live official team page naming the Chief Engineer and eight directors or project directors.

    Traffic Engineering and Transport Planning Agency · 2026-08-04

  • Lahore Division provincial directory entry for TEPA

    The official directory lists TEPA at 4-C Lytton Road, Lahore and phone 042-99212519. This is an office contact, not a dedicated fault line or proof that TEPA controls a particular signal.

    Lahore Division, Government of the Punjab · 2026-08-04

  • Lahore Division profile of TEPA

    The official profile places TEPA inside LDA and states that its Lahore role includes improvement of road geometry and operation and maintenance of traffic signals. It does not provide an asset register or settle exceptions for cantonments, DHA or other road bodies.

    Lahore Division, Government of the Punjab · 2026-08-04

  • SHO suspended

    A Wayback capture of the report names Sub-Inspector Faheem Imdad as Additional SHO Samanabad immediately before his reported suspension. The additional-charge wording is retained. The report does not establish his earlier start date or later posting.

    The News International · 2026-08-08

  • DIG Operations Lahore suspends three SHOs, demotes another

    The report names thirteen station house officers during a Sunday performance review. Suspension, demotion, warning and performance language is not converted into a tenure end. Each name becomes a holder observation dated to the reported meeting.

    The News International · 2026-08-06

  • DSPs, SHOs role sought in crackdown on outlaws

    The report names five station house officers during a Model Town Division performance review. A sixth named SHO is not linked because the report does not identify his station. Performance language does not establish tenure.

    The News International · 2026-08-06

  • 15,417 vacant posts of cops to be filled

    An incident brief identifies Mian Zaheer-ud-Din as the Mughalpura SHO on the publication date. It supports one dated holder observation only.

    The News International · 2026-08-06

  • SHO suspended for illegal detention

    The report identifies Inspector Muhammad Rafiq as Shafiqabad SHO immediately before his suspension on 30 December 2019. It supports a dated holder observation only.

    The News International · 2026-08-06

  • Student found dead in hostel room

    The report quotes Defence-B SHO Zia-ul-Haq in relation to an incident. It supports a dated holder observation only.

    The News International · 2026-08-06

  • Eight SHOs transferred

    The report names seven incoming station assignments and one officer transferred to Police Lines. Only the seven destination station assignments are imported.

    The News International · 2026-08-06

  • 40 SHOs among officers transferred

    The report was published on Saturday, 1 May 2021 and says the posting orders were issued on Friday, 30 April 2021. It names 25 incoming Lahore station assignments. Additional SHO wording is preserved. The remaining names in the article are transfers to Police Lines or non-station offices and are not imported as SHO assignments.

    The News International · 2026-08-06

  • Transfer and posting of cops

    The report was published on Wednesday, 9 June 2021 and says the DIG Operations issued the orders on Tuesday, 8 June 2021. It names four incoming station assignments. Three are explicitly additional SHO appointments.

    The News International · 2026-08-06

  • Three SHOs transferred

    The report was published on Tuesday, 22 June 2021 and says the order was issued on Monday, 21 June 2021. It names three incoming assignments and the two station holders who exchanged North Cantt and Defence Area A. The Garden Town appointment is explicitly additional SHO.

    The News International · 2026-08-06

  • Two arrested over harassment, including a brief on 14 SHO transfers

    The report was published on Wednesday, 29 December 2021 and says the transfer order was issued on Tuesday, 28 December 2021. It names 13 destination station assignments. The headline count of 14 also includes Inspector M Ikram, whose prior station is not named and whose destination is Police Lines. Raza Zakir's direct move from Mustafa Town to Shadman also supports one outgoing holder observation.

    The News International · 2026-08-06

  • 21 SHOs transferred

    The report was published on Saturday, 8 January 2022 and says the DIG Operations issued the orders on Friday, 7 January 2022. It names the officer and destination station for all 21 postings.

    The News International · 2026-08-06

  • Lytton Road SHO appointment

    The report directly names Inspector Zaheeruddin as the incoming Lytton Road SHO.

    The News International · 2026-08-06

  • Several SHOs reshuffled

    The report names ten incoming station house officer appointments. It also names two outgoing station holders and one check-post appointment. This import contains the ten incoming station assignments only.

    The News International · 2026-08-06

  • Several SHOs transferred in major reshuffle

    The report names nine incoming station house officer appointments. Police-post appointments and officers recalled to Police Lines are excluded from this station history import.

    The News International · 2026-08-06

  • Police officers transferred

    A report about awards at Satto Katla names the station house officer only as Nasir. The partial published name is preserved and is not joined to another person.

    The News International · 2026-08-06

  • SHO suspended for poor performance

    The report says DIG Operations suspended Tibbi City SHO Atif Zulfiqar at a Saturday performance meeting. It identifies the holder immediately before the reported suspension. It does not establish the start or later status of the posting.

    The News International · 2026-08-06

  • Three SHOs suspended for negligence, corruption

    The report names the Islampura, Sundar and Raiwind City station house officers immediately before their reported suspension on 18 November 2019. It supports dated holder observations only.

    The News International · 2026-08-06

  • Lahore gets first female SHO in 17 years

    The report states that Sub-Inspector Ghazala Sharif was appointed SHO Rang Mahal on 20 May 2017.

    The News International · 2026-08-06

  • Sixteen Lahore SHOs given appreciation certificates

    The APP report directly names sixteen serving Lahore SHOs. These are dated holder observations, not appointment events or inferred tenure ranges.

    Associated Press of Pakistan via UrduPoint · 2026-08-06

  • Lahore SHOs suspended, closed to Police Lines and replaced

    The report names eight incoming station appointments. It also identifies eight station holders immediately before suspension or transfer to Police Lines. Both evidence classes are preserved separately. Names are transliterated from Urdu. The report does not establish complete tenure.

    UrduPoint, carrying an Associated Press of Pakistan report · 2026-08-06

  • DIG Operations gives Lahore Police three days to arrest suspects

    The report directly identifies the serving SHOs of Samanabad, Liaqat Abad and Masti Gate on 30 November 2022. It records dated holder observations, not appointment events or tenure ranges. Names are transliterated from Urdu.

    Associated Press of Pakistan via UrduPoint · 2026-08-06

  • Large-scale Lahore SHO transfers before by-elections

    The report transcribes 22 destination station appointments from a notification. Twenty-one are joined to canonical stations. One destination is published only as Defence and cannot be joined safely to Defence Area A, B or C. Names are transliterated from Urdu. The report does not establish tenure.

    UrduPoint, carrying an NNI report · 2026-08-06

  • Transfer and posting orders issued for SHOs of 25 Lahore police stations

    The report transcribes 25 incoming station appointments and identifies seven outgoing station holders through direct station-to-station moves. Names are transliterated from Urdu. The order does not establish later service or a complete tenure.

    UrduPoint, carrying an NNI report · 2026-08-06

  • Transfer and posting orders issued for SHOs of seven Lahore police stations

    The report transcribes a Lahore DIG Operations notification naming seven incoming station appointments. It also identifies Babar Shaukat as Sundar SHO immediately before his transfer to Defence B. Names were transliterated from the Urdu report. No tenure continuity is inferred.

    UrduPoint, carrying an NNI report · 2026-08-06

  • Lahore station house officer transfers and postings

    The report names seven incoming station house officer appointments and five outgoing station holders ordered to report to Police Lines. Both evidence classes are preserved separately. Names are transliterated from Urdu. The report does not establish complete tenure.

    UrduPoint, carrying an Associated Press of Pakistan report · 2026-08-08

  • Sarwar Road SHO and eleven officers suspended after mistaken raid

    The report explicitly names Muhammad Irfan as Sarwar Road SHO at his suspension. A separate April report gives the fuller form Rana Muhammad Irfan. This later event is retained as an independent dated holder observation.

    UrduPoint · 2026-08-08

  • WAPDA overview and power-sector restructuring

    Explains that the utility power wing was corporatised into separate transmission, generation and distribution companies. WAPDA's current power role centres on major hydropower projects and stations.

    Water and Power Development Authority · 2026-08-02

  • WASA Lahore billing and connection frequently asked questions

    The page directs billing classification and related cases to the Deputy Director Revenue Office for the respective area. It supports the meaning of the DDR office branch, not a public ward or bill-area boundary.

    Water and Sanitation Agency Lahore · 2026-08-03

  • WASA Lahore complaint directory, earlier capture

    Official WASA page captured on 21 January 2022. It preserves the same eight complaint-routing sections as the May 2025 capture, although individual circle names and contacts changed. The exact checked file remains preserved in LSRW source-cache/TLS-043 with SHA-256 fddcd7e45e3f3c3604bc37c3a3250f174e9ea0b32d9e513f55d50f3057f06c4f.

    Water and Sanitation Agency Lahore · 2026-08-03

  • WASA Lahore complaint directory

    Official WASA page captured on 23 May 2025. The checked archive lists eight complaint-routing sections and their circle contacts. The live WASA host was unavailable on 3 August 2026. This is a dated roster, not a current boundary map. The exact checked file remains preserved in LSRW source-cache/TLS-043 with SHA-256 c619f38401dc3a8d649ae7d198c733c5492fe8717a32dffc8a6df0fed30d05d4.

    Water and Sanitation Agency Lahore · 2026-08-03

  • Water and Sanitation Agency Lahore · 2026-08-02

  • WASA Lahore core team

    Dated directory evidence. Names and assignments can change.

    Water and Sanitation Agency Lahore · 2026-08-02

  • WASA Lahore functions and complaint channels

    Lists water supply, sewerage and drainage functions. It also publishes helpline 1334 and complaint monitoring numbers. The page did not expose a stable update date.

    Water and Sanitation Agency Lahore · 2026-08-02

  • WASA Lahore water supply and sewerage infodesk

    The page does not state the observation date for its totals. Its numbers differ from the current overview PDF and are retained as a separate legacy-reported snapshot.

    Water and Sanitation Agency Lahore · 2026-08-02

  • Water and Sanitation Agency Lahore · 2026-08-02

  • WASA Lahore public tariff register

    The latest tariff document named on the public page is 2023. This does not prove that it remains the legally current tariff in 2026.

    Water and Sanitation Agency Lahore · 2026-08-02

  • WASA Lahore tenders

    The register showed a technical tender evaluation for the Lahore wastewater project and several current studies. A procurement entry does not prove that construction has started.

    Water and Sanitation Agency Lahore · 2026-08-02

  • WASA Lahore Water and Wastewater Management Project introduction

    Describes the earlier combined water and wastewater proposal. It names Shadman on Line B and gives the proposed first-phase BRBD surface-water capacity. The later AIIB approval document split the program and says the water-supply phase remained under provincial review.

    Water and Sanitation Agency Lahore · 2026-08-02