The Local State

What this record says

Updated ESIA for the sewerage system from Larech Colony to Gulshan-e-Ravi

The date is the PDF creation date. Section 3.2 describes the planned Line-B route and names the disposal stations whose sewage it is designed to collect. This is project evidence, not a current field-circle boundary.

Source

Original

Open the source we checked.

Use the original page or file to read it in full.