The Local State

What this record says

Preparatory Study on Lahore Water Supply, Sewerage and Drainage Improvement Project, Final Report, Volume 1

Chapter 6 distinguishes O&M areas, water-supply control areas and sewerage service areas. Table 6.1 gives the 25-subdivision O&M schedule and area totals as of May 2009.

Source

Original

Open the source we checked.

Use the original page or file to read it in full.