{
  "id": "net-wasa-lahore-water-supply",
  "recordType": "serviceNetwork",
  "name": "WASA Lahore water-supply network",
  "serviceCategory": "water",
  "functionIds": [
    "fun-lahore-water-supply"
  ],
  "operatorInstitutionIds": [
    "ins-wasa-lahore"
  ],
  "territoryPlaceIds": [
    "plc-pk-punjab-lahore-wasa-service-area"
  ],
  "systemForm": "Groundwater is pumped through tubewells into a reticulated distribution network. A separate surface-water phase is under review and must not be counted as operating supply.",
  "reportedSnapshots": [
    {
      "label": "Current overview",
      "snapshotType": "current-reported",
      "sourceDateLabel": "Public overview retrieved 2 August 2026",
      "metrics": [
        {
          "name": "Service area",
          "value": 380,
          "unit": "square kilometres"
        },
        {
          "name": "Served population",
          "value": 10.5,
          "unit": "million people"
        },
        {
          "name": "Water network",
          "value": 4400,
          "unit": "kilometres"
        },
        {
          "name": "Tubewells",
          "value": 597,
          "unit": "reported units"
        },
        {
          "name": "Water production",
          "value": 378,
          "unit": "million gallons per day"
        },
        {
          "name": "Operating source",
          "value": "groundwater",
          "unit": "source type"
        }
      ],
      "citationId": "cit-wasa-lahore-current-inventory",
      "qualification": "Agency totals. No current pipe or tubewell asset register was published with the overview."
    },
    {
      "label": "Undated infodesk",
      "snapshotType": "legacy-reported",
      "sourceDateLabel": "Undated public page retrieved 2 August 2026",
      "metrics": [
        {
          "name": "Water pipelines",
          "value": 3200,
          "unit": "kilometres"
        },
        {
          "name": "Tubewells",
          "value": 594,
          "unit": "reported units"
        },
        {
          "name": "Population",
          "value": 8,
          "unit": "million people"
        },
        {
          "name": "Water production",
          "value": 329,
          "unit": "million gallons per day"
        },
        {
          "name": "Connections",
          "value": 610000,
          "unit": "reported connections"
        },
        {
          "name": "Coverage",
          "value": 90,
          "unit": "percent"
        }
      ],
      "citationId": "cit-wasa-lahore-legacy-infrastructure",
      "qualification": "The source date is absent. Its totals conflict with the current overview and are not merged into it."
    }
  ],
  "evidenceState": "verified",
  "citations": [
    "cit-wasa-lahore-current-inventory",
    "cit-wasa-lahore-legacy-infrastructure",
    "cit-aiib-lahore-project-split"
  ],
  "lastCheckedDate": "2026-08-02",
  "reviewState": "reviewed",
  "notes": "The network identity and agency-level totals are verified as reported. Individual pipe, valve, meter, reservoir, tubewell and pressure-zone assignments remain open."
}