{
  "id": "cit-lesco-shadman-grid-capacity-2024-35",
  "recordType": "citation",
  "sourceId": "src-lesco-energy-demand-forecast-2024-35",
  "locator": {
    "filePage": 52,
    "endFilePage": 57,
    "printedPage": "41 and 46"
  },
  "quote": "Grid No. 191, 132 kV, SHADMAN",
  "note": "The source reports 120 MVA installed transformer capacity and a 53.4 MVA forecast for FY2024-25. This is an asset record, not a consumer-territory assignment.",
  "reviewState": "reviewed"
}