{
  "id": "ast-wapda-current-power-role",
  "recordType": "assertion",
  "subjectId": "ins-water-power-development-authority",
  "predicate": "role.current-power",
  "object": {
    "kind": "value",
    "value": "Major hydropower projects and operating hydropower stations"
  },
  "context": "operational",
  "qualification": "Retail distribution was separated into distribution companies. LESCO is the relevant default distributor for Lahore.",
  "evidenceState": "verified",
  "citations": [
    "cit-wapda-current-role"
  ],
  "lastCheckedDate": "2026-08-02",
  "reviewState": "reviewed"
}